Asbestos NOI Waiting Periods & Fees

Notification requirements and fees

Now that you’ve reviewed the asbestos requirements for renovation and demolition projects, and you’ve determined if your project qualifies as an owner-occupied, single-family residence or not, below are notification waiting periods and fees.

8/25/23, NOTICE for structures damaged by the August 2023 Gray and Oregon Road wildfires in Spokane County: We are waiving all asbestos notification fees for the demolition and renovation of affected structures.

Owner-Occupied, Single-Family Residence

Asbestos removal to be done by the owner-occupant:

Notification Waiting Period: Not Required
Fee: $0

________

Asbestos removal to be done by an abatement contractor for
10 linear feet or more, and/or 48 square feet or more (per residence, per calendar year)

Notification Waiting Period: Prior notice required
Fee: $0

________

Any demolition work

Notification Waiting Period: 3 days
Fee: $30

All Other Projects

Less than 10 linear feet and/or less than 48 square feet of asbestos removal making total (per structure, per calendar year) less than 10 linear feet and/or less than 48 square feet

Notification Period: None
Fee: $0

________

Less than 10 linear feet and/or less than 48 square feet of asbestos removal, but total removal (per structure, per calendar year) more than 10 linear feet and/or more than 48 square feet

Notification Period: Prior Notice Required
Fee: $75

________

10-259 linear feet and/or 48-159 square feet

Notification Period: 3 day notice
Fee: $250A

A = Includes demolition fee (if applicable) provided the asbestos and demolition projects are submitted on one notification.

________

260-999 linear feet and/or 160-4,999 square feet

Notification Period: 10 day notice
Fee: $500A

A = Includes demolition fee (if applicable) provided the asbestos and demolition projects are submitted on one notification.

________

1,000 or more linear feet and/or 5,000 or more square feet

Notification Period: 10 day notice
Fee: $1,250AB

A = Includes demolition fee (if applicable) provided the asbestos and demolition projects are submitted on one notification.

B = An added fee of $250 shall be paid for each increment of up to 1,000 linear feet when removing 2,000 or more linear feet.

B = An added fee of $250 shall be paid for each increment of up to 10,000 square feet when removing 10,000 or more square feet.

________

Any demolition work

Notification Period: 10 day notice
Fee: $250

Additional Categories

Amendment of Notification

Notification Period: Prior notice required
Fee: $0

________

Annual Notification

Notification Period: Prior notice required
Fee: $750

________

Emergency Notification

Notification Period: Prior notice required
Fee: Twice the regular fee

________

Alternate Asbestos Work Practices

Notification Period: 10 day notice
Fee: Twice the regular fee

________

Demolition with non-friable roofing

Notification Period: 10 day notice
Fee: Twice the regular fee

________

Exception for hazardous conditions

Notification Period: 10 day notice
Fee: Regular Fee